Step 1 — Site Evaluation and Design
We start with a detailed on-site evaluation: soil, drainage, grading, utilities, and layout. Then we create a clear project plan with slab thickness, reinforcement, finish, and joint layout, all outlined in a transparent, itemized estimate before you commit.
Step 2 — Demolition and Excavation
Old driveway materials are removed and hauled off. We excavate to the correct depth and address any soft soil, organic material, or problem areas to ensure a stable foundation from the start.
Step 3 — Base Preparation and Compaction
A compacted aggregate base (typically 4” of ¾” minus) is installed to 95% density. Forms are set to exact grade with proper drainage slope, and reinforcement is placed at mid-slab for long-term strength.
Step 4 — Concrete Placement
We place concrete to a verified mix design, consolidate it properly, and screed it to grade. No water is added on-site, ensuring maximum strength, durability, and performance in St. George’s climate.
Step 5 — Finishing and Control Joints
Timing is everything in desert conditions. We finish the surface at the right moment for a clean, durable result: broom, smooth, stamped, or exposed aggregate. Control joints are installed the same day to manage cracking.
Step 6 — Curing, Sealing, and Final Walkthrough
We apply curing compound immediately and protect the slab during the critical early days (24 hours foot traffic, 7 days vehicle traffic). Sealers are applied after full cure when needed. Final cleanup is completed, and we walk the project with you to ensure everything meets spec.